Hi,
I've post GR for Quality Material 10 EA. (Im Master Data in WM2 view I have 10 EA / Palett)
we have 10 EA but 3 EA for inspection lot
After the GR I 've created a TO. In the TO I have 2 positions (the 1st with 3 EA and the 2nd with 7EA) instead 1 Position with 10 EA.
I don't want to split the SU.
Where can I control it so that the system doesn't split the SU after inspection lot.
thanks
Dede
Thanks I've got it.
that is the standard process. The SU has normally to be split.
But in the Customizing WM go to the interface Quality you can control there if the su has to be split or not.