on 05-24-2008 4:51 PM
hi
when i do the PGI, date is 21/5. however, if do the reverse PGI (VL09), the posting date is current date (e.g. 24/5). How can i default the reverse PGI date is same as PGI date = 21/5
pls advice. thanks
Hi
JO JO
In VL09 please use the DEFINE DATE field for changing the PGI reverse date in yr case same as PGI date by this u can reverse the PGI in same date.
I am sure this will solve yr problem
Please reward with full points.
Thx.