cancel
Showing results for 
Search instead for 
Did you mean: 

QM Lot for Defect Items

Former Member
0 Kudos

hi guys,

Inspection lot for FERT were created, results recording was done for the lot qty (20 Nos), and 18 nos were accepted.

For the balance 2 nos defects recording was done and notification was raised (q3), then qm order was raised via notification.

my problem's are

when will be new lot created for balance 2 nos?

how to confirm the qm order?

i.e, some consumbles and activity (Lbr hrs) were used, i need to confirm the same and close the order,

pnts will be given

tks

murali

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42744
Active Contributor
0 Kudos

Are we talking about an 04 lot? If so, you would post the 18 to unrestrcited and the other two to "Other material" where you would post it to another batch.

Craig

Former Member
0 Kudos

hi,

yes talkign about inspection tpe 04,

i want to know how confirm actual valuse for qm order generated through notification,

again when will the lot (2 nos) be available for result recording

tks murali