hi everyone,
can you please tell how to install one meter(device) on a utility installation which can have meter readings but not billable.
Thanks and Regards
Mahavir
05-19-2008 4:56 AM
05-19-2008 4:56 AM
05-19-2008 6:05 AM
Hi,
Could you please tell me, if there is a meter(device) is already installed on a utility installation and which is billable, and if i want to install a new meter to the same installation and device location whoes readings are only required to check the meterings and not for billing. So please tell me how to install such kind of meter whoes readings are not billable.
Thanks and Regards
Mahavir
05-19-2008 6:53 AM
Hi
Please install the meter using t-code EG34 (Full Installation). However, while doing so; put the check mark in "Not Relevant for billing". With this u'll be able to create meter reading orders and enter readings but this consumption will not be used for billing.
Regards,
Puru
05-19-2008 6:58 AM
Thank you very much for your help.
Please tell me should i use EG31(Full Installation) or EG34(Billing Related Installation).
Best Regards
Mahavir
Edited by: Birendra Choudhary on May 19, 2008 8:00 AM
05-19-2008 7:10 AM
Hi
If the meter is already technically installed using EG33 (status INST), then use EG34. If this is a new meter (status AVLB) then use EG31. Pl reward pts if this works..
Regards,
Puru
05-19-2008 7:22 AM