SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Check meter installation in SAP-ISU

former_member303766
Participant
0 Kudos

hi,

Can anyone please tell me how to install a check meter in SAP-ISU-DM.

Please tell me complete procedure.

Thanks in advance.

Best regards

Mahavir

1 ACCEPTED SOLUTION

kevin_dewilde
Active Participant
0 Kudos

a check meter is usually a meter that is placed next to an regular meter to perform a check on the accuracy of the regular meter.

It can also check a group of meters instead of just one.

To install it, just instal it on an installation and possibly create register relations to automatically check the consumptions.

View solution in original post

17 REPLIES 17

Former Member
0 Kudos

Hi,

Create Meter Reading Units

Create Connection objects

Create Premises

Create Register Group

Create Installation.

This is the procedure till installation,further we have to full installation to make billing cycle works.

Thanks,

siva

0 Kudos

hi,

Could you please tell me what are check meters?

kevin_dewilde
Active Participant
0 Kudos

a check meter is usually a meter that is placed next to an regular meter to perform a check on the accuracy of the regular meter.

It can also check a group of meters instead of just one.

To install it, just instal it on an installation and possibly create register relations to automatically check the consumptions.

0 Kudos

Hi,

Thanks for your reply....please explain the installation procedure with transaction code.

It will be greate help.

Thanks and Regards

Mahavir

0 Kudos

The easiest way is transaction EG31.

Enter an installation, a device location and a date.

Other required fields may depend on your system's config.

Relations can be made with EG75.

I'd suggest you familiarise yourself with the sap menu for utilities (transaction SISU is a shortcut!), you will find may useful extra transactions there.

Don't forget to rewards points for helpful answers!

0 Kudos

hi,

Thanks for your reply.....could you please guide me in installing a check meter in an utility installation where a consumption meter has already installed. Should i mark the registers of the check meter as Not-relavant to billing,becs otherwise the consumption from check meter will also be considered in billing.

How should i make the register Relationship.

Suppose i have 13 registers in consumption meter and 13 registers in check meter. Should i make Check Meter's Register as main register.

Registers of Consumption meter.

Enter Register number u2013 1 for kWh

Enter Register number u2013 4 for kWh1

Enter Register number u2013 5 for kWh2

Enter Register number u2013 6 for kWh3.

Enter Operation code u2013 03 for kWh.

Enter Operation code u2013 04 for kWh TOD1.

Enter Operation code u2013 04 for kWh TOD2.

Enter Operation code u2013 04 for kWh TOD3.

Enter Register number u2013 3 for kVAh.

Enter Register number u2013 7 for kVAh TOD1.

Enter Register number u2013 8 for kVAh TOD2.

Enter Register number u2013 9 for kVAh TOD3.

Enter Operation code u2013 03 for kVAh.

Enter Operation code u2013 04 for kVAh TOD1.

Enter Operation code u2013 04 for kVAh TOD2.

Enter Operation code u2013 04 for kVAh TOD3.

Please guide in making the register relationship.

Thanks and regards

Mahavir

0 Kudos

Hi,

Please guide me in creating the register relationship between the check meter and the consumption meter through EG75.

Please guide me in making the register relationship.

Suppose if there are 13 registers in check meter and 13 registers in consumption meter.

Registers are

KWH

KVARH

KVAH

KWH1

KWH2

KWH3

KVAH1

KVAH2

KVAH3

KVA1

KVA2

KVA3

KVA

Thanks and Regards

Mahavir

0 Kudos

Hi ,

Relations can be made directly made with EG75,

so you can directly fill the relevant data and make the relevant data.

so you need not think about any other relationships here.

Reward points if useful

0 Kudos

hi,

My question is "in case of Check meters do we need to create register relationship with consumption meter".

Register relationship normally created in the registers of the same meter.In case of check meters,'Do we need to create register relationship with consumption meter'?.

Thanks

Mahavir

0 Kudos

Reply please......

0 Kudos

Please reply....its very urgent.....

Thanks

Mahavir

Former Member
0 Kudos

Hi,

YES, you have to create a Winding Group, to link the 2 (or more) Registers.

AAL!

0 Kudos

hi,

My question is "in case of Check meters do we need to create register relationship with consumption meter".

Register relationship normally created in the registers of the same meter.In case of check meters,'Do we need to create register relationship with consumption meter'?.

Regards

Mahavir

0 Kudos

My answer is still YES.

You shouldn't create the "relation" at Register Group level. You need to create a Winding Group that links the 2 Register Group (normal + check meter Register Group).

step-by-step.

Create Normal RG for consumption Meter

Create RG for check meter (mark as "not releavant for billing.")

Create the Winding Group

Create a Device

Install you new device.

Hope this clarifies,

AAL!

0 Kudos

hi,

Please tell me how we can link 2 Register Groups (normal + check meter Register Group) through a winding group (EGW1).

When i try EGW1 there i dont find any option to link the register groups.

Please elaborate.

Thanks

Mahavir

0 Kudos

No replies.....

0 Kudos

hi,

Please reply...its very urgent.

Thanks in advance.

Mahavir