on 05-17-2008 6:02 AM
dear gurus
can anybody help me , how to remove material block for availability check tranasaction
c
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Material can be blocked on two levels,
1) Distribution Chan Level
&
2) Plant Level
so we have to chk it first from Material Master Change Trans.
T/C - MM02
and chk status of following fields
1) X-Distribution Channel
and
2) X-Plant field
from Basic Data1 and Sale View 1 respectively.
If the material has been blocked then remove the block from these fields of Material Master.
and Save the changes.
I hope this may help you to smile.
If so award the points.
Enjoy...
Frm - Umesh Lokhande
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear
Please go in MM02,
If you want block the material on Production plant then go in MRP1 ---> Plant -sp.matl. status and do the status Z2.
If you want the block material on all plant then go in Basic data 1----> X-plant matl status. and do the status Z2.
Regards,
Sandip Shaktavat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
G Shankar
Go to MM02 -
MRP2 and remove availability check and put KP for no check.
Hope this will help you.
Edited by: DWARKESH THAKKAR on May 17, 2008 2:17 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.