dear gurus

can anybody help me , how to remove material block for availability check tranasaction

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

c

Former Member
0 Kudos

Hi,

Material can be blocked on two levels,

1) Distribution Chan Level

&

2) Plant Level

so we have to chk it first from Material Master Change Trans.

T/C - MM02

and chk status of following fields

1) X-Distribution Channel

and

2) X-Plant field

from Basic Data1 and Sale View 1 respectively.

If the material has been blocked then remove the block from these fields of Material Master.

and Save the changes.

I hope this may help you to smile.

If so award the points.

Enjoy...

Frm - Umesh Lokhande

Former Member
0 Kudos

Dear

Please go in MM02,

If you want block the material on Production plant then go in MRP1 ---> Plant -sp.matl. status and do the status Z2.

If you want the block material on all plant then go in Basic data 1----> X-plant matl status. and do the status Z2.

Regards,

Sandip Shaktavat

Former Member
0 Kudos

Hi

G Shankar

Go to MM02 -


MRP2 and remove availability check and put KP for no check.

Hope this will help you.