on 05-16-2008 8:11 AM
hi
system has triggered the inspection lot and transfered the material from quality to unrestricted as the batch got expired (recurring inspection) ,now we want to cancel the material document and consume with back date
is it possible
regards
thyagarajan
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
What i understand is that ur stock is in quality triggered by recurring inspection lot
Now as the batch got expierd u want to consume it in back date
In this u can caneel the document
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I don't no why the error is but i can tell u the path for by which
u can post this stock for which inspection lot is generated to quality . Then by usage decision u can post it whereever u want
Go to QA07
Ensert the material
Batch no & plant
Then activate indicator ' to inspection stock at lot creation '
Press execute
By this ur current inspection lot will have inspection lot stock
Amol
If QA07 was triggered the lot, how did the material get moved to unrestricted? That program does not move material to unrestricted.
If you made the UD, and moved it, did you extend the expiration date? The inspection lot when processed only automatically updates the next inspection date, not the expiration date. You must manually extend the expiration date via the UD when you make the UD, or manually do it via MSC2n.
Craig
hi Craig
i only moved the stock to unrestricted problem is i have posted the material against today date,due to some reasons of stock adjusting MM people is asking is there any provision to show the stock in previous period. for that iam trying to consume with back date but system is showing as Deficit
i hope you got the query
regards
thyagarajan
Hi,
What I could understand from the conversation is;
You had a lot for recurring, due to next inspction date, you processed the lot, perfomed UD and stock posting. with current date (e.g. 19.05.2008)
But now you need to show some consumption for the batch stock in batck date, the date some where between lot creation date and Posting date, hence you need to re-perform the UD in batck date (e.g 17.05.2008, to show consumation on 18.05.2008)
Correct?
If yes then you need to cancel the UD, reverse the Stock Posting and then re-post the stock in correct date.
To do such so, you need to call the programme for UD reversal, by mannual execuation.
Regards,
Shyamal
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.