on 05-12-2008 8:41 AM
Hi,
Is there any possibility to change the SC which is approved?
Regards
Ramesh
Hi. As far as I know it is not possible as standard.
If you try any of the function modules, such as BBP_PD_SC_UPDATE, you will get an error saying status = approved.
I have also tried changing status back, then changing, then setting back to approved, but the status change function BBP_PD_SC_STATUS_CHANGE_WF also gives an error saying cart = approved.
It might be possible but I have not found a way.
Why do you want to change an approved cart though? There might be a work round to your problem.
Regards,
Dave.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi. Are you using classic or extended classic?
If it is classic you can just un-delete the PO in the backend R/3 / ECC system in ME22N, then press the open padlock icon.
I can not remember if you can do the same in SRM with extended classic, I only have access to classic systems at the moment.
Can anyone else confirm if you can un-delete a PO in SRM?