cancel
Showing results for 
Search instead for 
Did you mean: 

Splitting of Cost into Fixed & Variable

Former Member
0 Kudos

Hi,

In our current scenario there is only one cost and there is no split between them. Now my customer wants the cost to be split between fixed & variable. At present we are using KP26 to plan the cost. Here my cost will hit only one cost element (say A) at present. Requirement is to split this cost into fixed and variable and send to two separate cost elements (say B & C) for the same activity type and afterwards do the setllement accordinlgy.

Can any one please guide me on how to achieve this.

Thanks & Regards

Sreekanth

Accepted Solutions (0)

Answers (1)

Answers (1)

varshal_kachole3
Active Contributor
0 Kudos

Hi,

1.This can be achieved by creating two Activity types .eg AT1 for fixed, AT2 for the Variable.

2. Do not assign the default Activity type in the Work center (Costing Tab)

3. When you want to create the activity to capture the cost at fixed and variable level, create a single activity and assign two different activity elements e.g AT1 and AT1.

Now for these two activitiy elements assign the resepctive work center and the activity type as per the need.

4. This will capture the cost as requested by you.

Hope it works for you, Please reward points if found useful.

Thanks!