on 05-01-2008 5:32 PM
Hi All,
Iam doing a scenario from RFC-XI-Webservice.
I have configured the rfc sender communication channel.
I have created an rfc destination in r/3 pointing to the XI server with a registered program id.
Created an rfc dest in r/3 server pointing to itself with program id.
this is same given in cc for the rfc.
When i run my scenario..the cc is in green status, but there is no message(error or success) into moni.
do i need any connection settings in the XI server in sm59?.
there is a tcp connection to the r/3 server in sm59 in XI and works fine.
Do i need snc parameters?.
refered to blog /people/michal.krawczyk2/blog/2005/03/29/configuring-the-sender-rfc-adapter--step-by-step and /people/shabarish.vijayakumar/blog/2008/01/08/troubleshooting--rfc-and-soap-scenarios-updated-on-20042009
Do i also need any config to be done in my custom rfc?..its remote enabled.
hi friend,
I got the similar problem too, where adapter showing green color and with no messages processed.I could figure out the problem.
1. go to SXMB_MONI and see the message status (a).processed (b)scheduled for processing (c) or error
since adapter engine is showing green color it must be showing b.
2 If this is the case check both payloads inbound and outbound in the SXMB_MONI double click the message.
3 check for the status of the message queue, refresh the queue then it should show the output.
regards
praveen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.