hi friends,

i want to use usage decision of accept or reject only at the time of goods reciept(production). can any body pl help me how to do the same. thanx in advance....

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In Material Master -- > Quality Management -- > Inspection Setup.

Add the inspection type 04 & Tick on active.

Now if you will create a production order & do the goods receipt against this production order. The stock will move to Quality Inspection & an Inspection Lot will be generated by system.

Against this inspection lot you can give the usage decision in Transection Code QA12.

Hope this will help you.

Thanks,

Navin

Former Member
0 Kudos

hi navin,

thanx for reply. inspenction lot has created. now how to assign usage decision to it. thanx in advance..

Former Member
0 Kudos

hi

for usage decision you have inspection lot which has status Release

please check QA02 for inspection status

you dont have to assign Usage decision.

you have to assign task list or in material specfication to that inspection lot

go to qa02 view specification tab select task list tab for that you have to create material specification before by t codes QS61 .and maintain material master qm view material specification tick

regards

Pravin

Edited by: pravin dhokey on Apr 30, 2008 1:10 PM

Former Member
0 Kudos

Hi,

Goto QA02 transection & give the Usage Decision.

You have to select the Accept or Reject code as per your requirements.

Thanks,

Navin

Former Member
0 Kudos

Sridhar,

You need to perform result recording after the inspection lot is created. Please check that Inspection lot is released before you conduct the UD. In QA02, see that material specification/inspection plan are properly maintained.

In case you want to force the inspection completion you can goto QE51--> UD or goto QA11 and record Usage decision by force completing the result recording. Here you can then accept/reject as per your procedure.

Kiran

Edited by: Kiran Magar on Apr 30, 2008 1:36 PM

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

maintain inspection type 04 so that inspection lot should be created at the time of goods receipt from production and maintained skip allowed in the detail screen of that inspection type in quality management.

make usage decision by QA11 accepted or rejected

Regards