cancel
Showing results for 
Search instead for 
Did you mean: 

BPM Error

Former Member
0 Kudos

Hi

I am doing the BPM scenario for collecting the MATMAS IDoc ...hwen i checked the BPM in SXMB_MONI when i press the PE then its showing IN PROCESS status..

What could be reason .. there should be any configuration i have to do in SXMB_ADM or its a just design issue

SV

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

go to the sxmb_moni_bpe to check the step, which is running and taking a lot of time

Former Member
0 Kudos

hi

From SXMB_MONI go to the workflow monitoring for the BPM by clicking the PE link. Find out which step of the bpm is taking time.

This will happen if you configure acknowledgements or correlation.

rgds

Arun

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi

I set up the endcondition as 1 = 1 ( i think thats one for Infinite loop ) thats causing the problem

In SXMB_MONI the column nect to PE is in a Clock status

SV

Former Member
0 Kudos

Hi S V,

--> What is the status code in sxi_cache for your BPM scenario?

--> check, if any thing is there in smq1&smq2

and let us know.

Regards,

Ramesh.

former_member556603
Active Contributor
0 Kudos

Hello SV,

Click on the PE in the SXI_MONITOR and go to the workflow log of your BPM and check on which step did it finish.

Then go to the technical workflow log and you'll see the error click on it twice.

refere to this:

https://websmp203.sap-ag.de/~sapdownload/011000358700003141152005E/HowTo_Monitor_ccBPM.pdf

Check this document for troubleshooting BPM..

https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e7bc3a5a-0501-0010-1095-eb4...

BPM Tips and tricks

https://www.sdn.sap.com/irj/sdn/wiki?path=/display/cpm/bpm%2btips%2band%2btricks

Thanks,

Satya Kumar

Former Member
0 Kudos

Hi,

Do check whether the 'end' condition that you would have set in the loop is getting satisfied for a particular input IDoc.

Thanks,

Anand

samiullah_qureshi
Active Contributor
0 Kudos

Hi

should be any configuration i have to do in SXMB_ADM?

you don't need to any configuration in SXMB_ADM.

its a just design issue?

This may be a design issue.

Are you using correlation in design of integration process.?

If yes then may be BPM is waiting for he successful execution of correlation.

As mentioned in above replies from sxmb_moni by clicking on PE you can see workflow of your BPM and come to know which step of your BPM is in waiting step.Check properties of that step in your integration process.

If you are still facing problem then you can let us know.

Regards

Sami

Reward points if helpful.