Hi,

i want to schedule adapter at partticular time in day i.e. at 12 AM every day ,how can i do that.should i run the adapter evevry day?

Regards,

Jhanavi

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member556603
Active Contributor
0 Kudos

Hi,

Refer to this link for scheduling the FTP adapter:

http://help.sap.com/saphelp_nw04/helpdata/en/45/06bd029da31122e10000000a11466f/frameset.htm

/people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

Thanks,

Satya Kumar

Former Member
0 Kudos

Jahnavi,

1) In the Sender Communication Channel, Under Processing Parameters set the time as 1 day ( in Secs) for the parameter "Poll Interval" with adapter status as "Incative".

2)Change the Adapter stauts form "Incative" to "Active" at exactly 12 :00 am so that it is scheduled everyday at the sametime.

Hope it resolves the issue !

Reward points if useful...Thanks

Former Member
0 Kudos

Hi. Raghavendra,

__Change the Adapter stauts form "Incative" to "Active" at exactly 12 :00 am so that it is scheduled everyday at the sametime.__

should i do it everyday

Thanks,

Jhanavi

Former Member
0 Kudos

Hi,

Tha will be done Automatically when you have done the Schedule of CC

Regards

Seshagiri

former_member556603
Active Contributor
0 Kudos

Hi,

Yes it will be Automaticaly done..

Thanks,

Satya ..

former_member556603
Active Contributor
0 Kudos

Hi,

That will done automatically..

There is one more option for this:

Use BPM in this interface and put Wait step there and mention u r time slot Eg: 1 sec or 1 min.

Wait Step

Use

You use a wait step () to incorporate a delay in a process. Usually, you use a delay to define when the next step in the process is to start. You can define a delay as either a point in time or a period of time.

At runtime, the step waits until the specified point in time is reached or the specified period of time has passed. The system then continues the process by proceeding with the next step.

Thanks,

Satya Kumar..

Reward points if it is useful..

Former Member
0 Kudos

Hi satya,

will using BPM be good.what steps should be used in bpm?

i think by using BPM there will be lot of load on xi server?can you explain what steps should be used in BPM for this process?

Regards,

Jhanavi

Former Member
0 Kudos

Hi,

Polling based upon availability

http://help.sap.com/saphelp_nw04/helpdata/en/45/06bd029da31122e10000000a11466f/frameset.htm

/people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

Regards

Seshagiri

Former Member
0 Kudos

Hi seshagiri,

my xi version is XI3.O SP10,how can i acheive it.

Thanks

Jhanavi

Former Member
0 Kudos

Hi,

This facility is available from SP19 onwards

you shld get it

Regards

Seshagiri

former_member556603
Active Contributor
0 Kudos

Hi,

my xi version is XI3.O SP10,how can i acheive it.

From 7.0 SP14 and 3.0 SP19, you can schedule your communication channel availability times.

Thanks,

Satya Kumar

Reward if it is useful.