What is MRP Type?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

MRP type controls which mrp procedure can be used to plan a material and which mrp parameters can be entered when maintaining material master. you have to enter this mrp type on MRP 1 view of material master record.

ND - No planning

PD - Planning

Answers (1)

Answers (1)

Former Member
0 Kudos

MRP type - Key that determines whether and how the material is planned. You have the following options:

manual reorder point planning

automatic reorder point planning

forecast-based planning

material requirements planning with forecasts for unplanned consumption

master production scheduling (MPS)

Raghu