Using Route in Sales Order

Former Member
0 Kudos

Hello Gurus,

Can someboday explain me the basic concept of route process in Sales Order? Please explain me the following scenario

a. I have createed the route from country A to Country B -> 7 days

b. We are in Country A and creating an order for the customer in country B.

c. if we create the order with the delivery date 25.04.2008 how the date is calculated ( confirmation date , mat.avl. date, delivery date etc. case 1. stock in hand , case 2. against future PO dated 15.05.2008)

Thanks in advance.

Regards,

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Ramesh,

The system takes into account the following 4 conditions for determining the Route –

a. The country and the Departure Zone of the shipping point +

b. Shipping Conditions agreed in the sales document type or with the sold to party +

c. Transportation Group assigned to the material +

d. The country & Transportation Zone of the ship to party (in CMR)

. Route can be manually overwritten during a sales order processing. You can re-determine the route in the outbound delivery based on weight (weight group) provided it is allowed in the configuration of the delivery type.

Scheduling takes into account the following times –

a. Transit Time +

b. Loading Time +

c. Pick/Pack Time +

d. Transportation Lead/Planning Time.

The loading time and pick/pack time come from the shipping point whereas the transit time and transportation lead time come from the route.

The system performs backward scheduling first to confirm the required quantity checking the material availability on the material availability date. If the material availability date or the transportation planning date falls before the order date, the system automatically carries out forward scheduling and will propose a future date. A delivery type can be customized to carry out “rescheduling” if required during the delivery processing.

REWARD POINTS IF HELPFUL

Regards

Sai

Former Member
0 Kudos

hi

Route is determined automatically in the sales order based on:

1.Departure zone or country of the delivering plant

2.Destination zone or country of the Ship to Party

3. Shipping condition from the customer master

4. Transportation group from the material master

5. Weight Group.

for this.........

Step: 1

Define Modes of Transport

Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Define Routes—Define Modes of Transport.

Step: 2

Define Shipping Types

Path: Under the Same Menu path---Define Shipping Types

Select New Entries and Assign the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr) and Assign Shipping type Procedure group.

Step: 3

Define Transportation Connection Point

Path: Under the Same Menu path--- Define Transportation Connection Point.

Step: 4

Define Routes and Stages.

Path: Under the Same Menu path--- Define Routes and Stages.

Select the New Entries and Enter the Details

Then Select the Routes stages and define

Step: 5

Maintain Stages for all Routes.

Path: Under the Same Menu path---Maintain Stages for all Routes.

Step: 6

ROUTE DETERMINATION

Define Transportation Zone

Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Route Determination—Define Transportation Zone.

Step: 7

Maintain County and Transportation Zone for Shipping Point.

Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.

Select the Shipping point and enter the Country and Transportation Zone

Step: 8

Define Transportation Groups.

Path: Under the Same Menu path---Define Transportation Groups

step: 9

Maintain Route Determination

Path: Under the Same Menu path--Maintain Route Determination.

Go to Customer master data.

In Address of General data. Enter the Transportation Zone id. and save

U will get the route.

I hope this will help you.

Edited by: Roddick Redy on Apr 25, 2008 1:22 PM

reazuddin_md
Active Contributor
0 Kudos

First system will do the forward scheduling- i.e. if you maintain the Lead time in days field in MMR - system will assumes that the material is available within mentioned days-+add the days in route and will give the confirmed delivery date.