on 04-19-2008 9:59 AM
Hi guys,
I use IDES to run an demo project, set collect WBS , and assign material A to 2 options:
option 1 needs A 5 pcs
option 2 needs AB 10 pcs
After running MRP, I have 2 PRs for the material A and both belongs to the same WBS Code .
PR1 , A 5pcs, special stock flag Q, WBS code: P-1
PR2, A 10pcs, special stock flag Q, WBS code: P-1
And then I convert PRs to POs,
PO1 , A 5pcs, special stock flag Q, WBS code: P-1
PO2, A 10pcs, special stock flag Q, WBS code: P-1 .
Now, I change the qty in the WBS to
option 1 needs A 10 pcs
option 2 needs B 5 pcs
Run MRP again, I have a new PR
PR3 , A 5pcs, special stock flag Q, WBS code: P-1 .
That confused me, if the special stock flag links with WBS code P-1 , why the resources can't share ? I mean the total qty of A for P-1 is 15, its enough. I test again after GR to stock , still generate PR3.
And then I found the material docs of GR shows the resources (stock) belong to WBS and NETWORK .
How to configure to share the resources under the same WBS code (special stock) ? I dont want another PR3 .Thanks all !
Wayne
Hi,
Need some clarity. here in ur example are u talking to two material A & B.? or only one material A and two operations or activities under same WBSE.
Try by selecting procurement type as PReq+Reservation for WBS element. By doing so for all the requirements under that WBSE will b acct assigned to that WBSE.
Thanks
Saikishore Ganga.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sorry, made some copy mistake .
The Question should be :
-
I use IDES to run an demo project, set collect WBS , and assign material A to 2 options:
avtivity 1 needs A 5 pcs
avtivity 2 needs A 10 pcs
After running MRP, I have 2 PRs for the material A and both belongs to the same WBS Code .
PR1 , A 5pcs, special stock flag Q, WBS code: P-1
PR2, A 10pcs, special stock flag Q, WBS code: P-1
And then I convert PRs to POs,
PO1 , A 5pcs, special stock flag Q, WBS code: P-1
PO2, A 10pcs, special stock flag Q, WBS code: P-1 .
Now, I change the qty in the WBS to
avtivity 1 needs A 10 pcs
avtivity 2 needs A 5 pcs
Run MRP again, I have a new PR
PR3 , A 5pcs, special stock flag Q, WBS code: P-1 .
That confused me, if the special stock flag links with WBS code P-1 , why the resources can't share ? I mean the total qty of A for P-1 is 15, its enough. I test again after GR to stock , still generate PR3.
And then I find the material docs of GR shows the resources (stock) belonging to WBS and NETWORK .
How to configure to share the resources under the same WBS code (special stock) ? I dont want another PR3 .Thanks all !