Inspection for every 10th piece or lot

Former Member
0 Kudos

Hi Experts

We have good supplier and good manufacturing processes at the client site.

They do not want to inspect every other piece,

They want to inspection every 10th piece or lot for purchased parts and also for produced materials in shop floor.

Pls advise in detail how this can be done.

Many Thanks.

Gaurav

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member698542
Active Contributor
0 Kudos

Hi Gaurav,

Please use Dynamic Modification Rule for purchased lot

Use Inspection Point for Production process. The Inspection Point should be quantity based for every 10 pieces

Thanks and regards

Murugesan

Former Member
0 Kudos

Hi,

You can use DMR as other poster suggested.

Pl go through the link for details regarding dynamic modification of the inspection scope.

http://help.sap.com/printdocu/core/print46b/en/data/en/pdf/QMQCDYN.pdf

Regards

K.M.Arun

Former Member
0 Kudos

Hi,

create Dyanamic modification rule as per your requirement for skipping of the desired lots. Assign the DMR in the inspection plan.

hope this will suffice your requirement.

Regards,

Anil