cancel
Showing results for 
Search instead for 
Did you mean: 

IDOC QPMK01

Former Member
0 Kudos

Hi,

Has anyone moved the contents of table QPMK from Acceptance to Production through transaction QL21 using the IDOC QPMK0. I have done the partner profile setting and the port setting in WE20 and WE21 but still I am not able to create the entries in the Production system.

Have someone worked on the same already?

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member698542
Active Contributor
0 Kudos

Hi Bhuvana,

Have you created the Logical system for the Production system and assign it on the Target system field.

Thanks and regards

Murugesan

Former Member
0 Kudos

Hi,

I have created the logical system and assigned it on the target system field. I am able to create the IDOC and the IDOC status is 03 (Data passed to Port OK) but in the target system both the tables QPMK and QPMT are not getting updated.

Thanks & Regards,

Bhuvaneswari