PO replication to R/3 from EBP in Extended classic scenarion

Former Member
0 Kudos

Hi All,

We are using ECS for plan driven procurement and bidding engine in our system.presently we have configured the system in sand box.We can able to do the entire cycle like PR transfer from R/3 to Sourcing cockpit upto PO creation in SRM.But PO's are not replicating to R/3. can any body suggest what may the problem for PO replication to R/3.

Thanks in advance.

Nanaji

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

You need to check mainly the backend integration settings

like "Define backned settings" with correct sys type & RFC destn.

required attributes pertaining to backend in SRM org

check logs in SLG1 & RZ20 in SRM

BR

Dinesh

imthiaz_ahmed
Active Contributor
0 Kudos

refer to this link

Besides that please check the WF log for WS14000077.

Regards,

IA