Hi

I have a situation wherein the customer wants to track inventory based on Engineering change.

For example if Part1 has components A, B and C ; based on ECM the component C is replaced by D from a specific date.

How to track inventory in this scenario based on ECM

Thanks a lot

Edited by: SunnyD on Apr 15, 2008 7:10 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Friend,

you can maintain with variant configuration.

Former Member
0 Kudos

VC is not an option for this, as the finished goods does not change at all. it is only the BOM components or manufacturing option

Regards

SunnyD