on 04-10-2008 10:28 AM
hi all,
1. is it possible to maintain two priliminary legs for a transportation?
2.if it is possible which shipment type will i use when do two priliminary legs.?
3.can anyone suggest me i will do for this scenario
A--(truck)B(train)-C--(sea)---D
here b is a load transfer point.
4.how will do calculate shipment cost for a load transfr point.
please help me out
ASAP.
thanks
vijay
Hi,
You can visit the following link for the same:
http://help.sap.com/saphelp_46c/helpdata/en/93/743ef3546011d1a7020000e829fd11/frameset.htm
regards,
Siddharth.