on 04-04-2008 7:09 AM
Hi Guys,
What configuration and master data to followed to make the material ATP will be carried out in APO?
Thanks and regards
Thamizhchelvan G
Answers seem to point in right direction. Closing thread.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Some crucial things for configuring ATP in APO
- Make sure you have ATP check integration Model ON for the Location Product
- Make sure you have defined a ATP run for the Business Event(like sales order) and the Checking group
- Checking horizon is populated correctly from R/3 as planned delivery time
- There should be an allocation procedure defined in SPRO that is setup in Location Product in APO
these are basic things needed for availability check calculation. There are host of others for setting up allocation check or other kinds of check that you can find in this forum.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
There was a thread which on the same sometime back.please check for that. If you do not find it let me know.
Regards,
Deepthi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.