Prerequisites for MPS Planning Execution/Evaluation

Former Member
0 Kudos

Can u guide what r the Prererequisites for the MPS Planning Execution/Evaluation? What setting I have to done to run MPS?

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

For MPS define MRP type M0 or M1 or M series in mrp1 view.

If you want to include planning time fence use M1,M2,M3 or M4. System will ask for planning time fence in no. of days.Define in that view itself.

Otherwise you can use M0, it is equal to MRP PD.

To run MRP use

MD41 - Single item multi level

MD42 - Single item single level

MD43 - Interactive planning

Result check in MD04.

Note: You can run mrp for MPS material by MD02 also. But to run MRP ie PD, MD41 will not use.

Regards,

Dharma

Former Member
0 Kudos

hi

For MPS u have to set M1 - M4 as MRP Type and maintain planning time fence.

Run MPS. single level. It is used only for important parts for which u want to firm ur procurement proposals.

Reward if useful.

Amit

former_member698542
Active Contributor
0 Kudos

Hi Satish,

MPS is part of MRP. There are three types of MRP levels...MRP, MPS and CBP.

In MPS you can plan important assemblies sepeartely (critical parts and which has much influence on the profit- A type). You can mark the assemblies as MPS parts by assigning the MRP types M0 to M4 and Planning Time Fence (PTF) in the material master MRP1 view.

Normal MRP types parts will be marked with MRP type PD and P1 to P4 in the material masters. Here you can plan all B and C (less important assemblies).

Normally MPS run before the MRP and during MPS system plans only those parts which are marked as MPS parts via MRP type. Here MRP plans single items (MPS items) and dependent requiremenst will be created for the parts which are just below the MPS assembly. It is advisable to run MPS a day before of the MRP run.

Transaction codes: MPS can be run from MD41 (single item multi level) MD42 (single item single level),MD40-Plant level MPS and MDBS (Background plant level MPS).

Normal MRP can be run from MD02 (single item multi level), MD03 (single item single level) and MDBT (Background plant level MRP).

You can also run online plant level MRP from MD01 and MD40 (MPS)

Advantages:

1) MPS: With MPS run you can plan all your important assemblies and finsihed parts much before the dependent requirements are planned within BOM. Once MRP controller satisfy with the MPS plans then the dependent requirements will be plan from normal MRP run.

During normal MRP run system will not plan MPS parts again. only dependent assemblies and parts will be planned.

Thanks and regards

Murugesan