pegging interaval

Former Member
0 Kudos

Hi guys ,

I want to use dynamic pegging .

Consider that my requirement is on 27/03/2008, i want to include the receipt from 16 to 22 .

What should be my maximum earliesness and lateness in product master.

Please help me

Thanks and regards

Thamizhchelvan G

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

The maximum earliness or lateness is a business requirement or industry requirement depending on the products you are handling. If there is no transit time between the customer requirement (on 23rd) and supplies at a store (assuming there is a valid transportation lane between the two locations) and if you are using the strategy 'Backward Scheduling', all receipts between 16th and 22nd should be considered as potential receipt elements when you trigger a planning run.