hello, friends.
i set up configurable material ZZ000001. this is assigned to a class and configuration profile.
there are 2 characteristics assigned to the class, which are:
Z_COLOR_1 (with characteristic values red, blue and yellow)
Z_SIZE_1 (with characteristic values big and small)
i have set up variant pricing VA00, and these are all working fine in the sales order.
now i assigned class and characteristic value to the following components:
material 800000375, class type 200 Z_COLOR_1, value 'red'
material 800000376, class type 200 Z_COLOR_1, value 'blue'
material 800000377, class type 200 Z_COLOR_1, value 'yellow'
material 800000378, class type 200 Z_SIZE_1, value 'big'
material 800000375, class type 200 Z_SIZE_1, value 'small'
these components are listed in the BOM, usage 5 (SD) as L (stock items).
now my questions:
1. when i enter ZZ000001 in the sales order and save, this material shows up in the requirements after running MD04, but the requirements for the components are '0'; do the components have to show up as requirements?
2. if i want to them to show up as requirements, how do i set up the BOM using CS01?
i was able to set up such that the components also show up as requirements together with the configurable material but i seemed to have forgotten this already.
thanks for your help!
regards.
Hi,
Did you check your item categories, if there has to be a transfer of requirements at sub-item level the main item category group has to be LUMF and item category TAP or an appropriate copy there of?
thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Those 800.... items need to be components in the Z-material BOM. Make sure each one has the "relevant to Sales" checked.
Each of these components also need a Object dep. created and attached to them as a Selection Condition
800000375, Z_COLOR_1 = 'red'
800000376, Z_COLOR_1 = 'Blue"
Sounds like you are single level, so the syntax should be as simple as that.
For these to show up as requirements you need to have a Schedule Line category setup that drives requirements. If you are just an SD person get a PP person to help with that.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.