on 03-18-2008 2:50 PM
dear all,
for a construction company we are customizing mile stone billing.
we need a payment in four stages like,
1) initial amount (which is 10% of total amt)
2) 25% as second instalment(after 1 mth)
3) 35% as third instalment (after 2 mth)
4) rest of the amt as a final settelment i.e . 30%.
kindly help us out with detail information of each billing date in billing plan type along with the various document type to be used.
Thanks & Regard's
sadique
Hi
Your scenario can me mapped into SAP as a down payments
configuration
item category group - 0005
item category - TAO
for this item category already a billing plan is set
now when create a sales order and enter a material and then go to item data a billing plan tab will be there in the sales order. go to that billing plan tab
Now go and enter the dates , in your example
material - mat1
start date 01.03.2008 net value :1lakh
date bt blocked bd bill type
01.03.2008 0009 10% 02 5 FAZ
01.04.2008 0009 25% 02 5 FAZ
01.06.2008 0009 35% 02 5 FAZ
01.07.2008 0009 35% 02 5 FAZ
Fill the start date, the dates u neeed as i have entered and the 0009 number automatically remaining will get triggered. enter the billing type manually as FAZ or else it will take F1. , and the place where 5 has been put by default 1 will come change it to 5
Billing document type - FAZ
Cancellation Billing document type - FAS
the above is the example . i hope nw you can map into SAP.
Reward points if useful and any queries let me know
Regards
Srianth
Edited by: sri nath on Mar 18, 2008 4:12 PM
Edited by: sri nath on Mar 18, 2008 4:13 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Sri nath,
Thanks for ur immidiate contribution. but even iam facing a problem at the time of billing, its showing a log
"0000012083 000010 For down-payment requirements, only billing rule 4 or 5 can be used" even though iam using a billing rule 4 (as it is % basis).
one more thing to share with u is when iam creating a delivery document for final billing (at stage four) with f2, the del doc does not show any delivery quantity with a log "Only 0 EA of material MAT available (Message no. VL150)" although stock is available at that relevent storage location.
kindly help me to resolve the querry.
Thanks and Regards,
sadique
Hi sadique
As it is related to downpayment you need to assign billing rule either 4 or 5 only 4 is for percentage basis and 5 is for value basis. and for the material mat you might have done delivery fully. so for the 1st time you need to do OR - LF - F2 . from 2nd time onwards you need to create only VF01. and remove the block. for that billing date. at sales order level. and billing will be created with reference to order number only.
check at delivery level weather the relavant for picking has been chekced or not for the item category. and check for the TAO item category also ,weather item relavant for delivery is checked or not .
In copy control vtfa copying requirements 20 which is down payment request and copying requirements 23 must be maintained for item category TAO which is down payment clearing.
check weather have you assigned the condition type AZWR which is down payment settlement, which has a requrement 2 an calc type 48.
let me know the status once you have checked and worked on it
Regards
Srianth
thanks for all help, iam closing this issue
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.