on 03-18-2008 10:35 AM
Hi all,
In the same billing order, we want to maintain both VALUE and PERCENTAGE.
Is it possible? If yes then how?
Thanks a lot,
Jn
hi,
Billing plans are controlled in Customizing for Sales by the following elements:
· Billing Plan Type
· Date Description
· Date Category
· Proposed Date Category
· Proposed Date
· Assigning billing plan types to sales document items
Billing Plan Type
The billing plan type defines the basic control data for the billing plan. For example, the billing plan contains rules for date determination. These rules determine, for example, the beginning and end dates for the schedule of billing dates. The billing plan type also contains a date rule for determining the horizon for the billing plan. The horizon calculates the last billing date in the billing plan, based on the current date plus a specified time period (for example: todays date plus one year). The standard version of the SAP System includes the following billing plan types:
·Milestone billing (for example, billing dates determined by the percentage of project completion)
·Periodic billing (for example, monthly fees for a rental contract)
The billing plan type is displayed in the sales document but cannot be changed.
But bringing in the value and percentage value both will be like combining the two plans which is really difficult to manage in one billing plan.
regards,
Siddharth.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.