on 03-17-2008 3:59 AM
I have been using Product Substitution in Sales Orders. Can anyone inform me how to use them in Project Systems. Say, while adding material in CJ20N, I want the material to be automatically substituted by the substitute material.
Hi,
Follow-up material gets automatically selected in networks if follow-up material is maintained in MRP4 view of material master. However, product substitution what you have mind could be something else ?
Muraleedharan.R
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Murali/Sid
I am also stuck with the same confusion if material Determination is applicable to PS.
I am getting the substitute material as a subitem with the same reservation number but the requirement is generated for the 1st item.
I want the requirement to be generated for the second item.
Pls guide if u have figured out something...
Regards
Praveen B.K