I am trying to configure automatic determination of stages for deliveries in the shipment legs
But every time all deliveries at all stages remain in one stage and then I have to move them manually or sometimes even that is not possible
I must be doing something wrong
Any ideas / tips from Gurus out there
hi,
Check out what you are missing in the steps you had followed from the standard procedure and also check the pre-requisites of automatic determination.
Prerequisites
This algorithm is triggered automatically in the following circumstances:
When a route is entered in the shipment header
After you carry out leg determination with category 0 to 4 (leg determination category 0 initiates the assignment determination process only).
Procedure
Assignment determination is carried out as follows:
The system analyzes the point of departure and destination for each delivery, one after the other (see also step 2 in Automatic Leg Determination.
If the point of departure of this delivery is found among the departure points of the existing legs and the destination is found among existing destinations, the system then looks for the legs that connect these two locations.
If the legs are incomplete (that is, if there are gaps between them), the delivery is assigned to all legs that start at the beginning point and also to all those that end at the destination.
If only the departure point exists in the system, the system assigns all adjoining legs to the delivery.
If only the destination exists in the system, all adjoining legs are assigned to the delivery (in other words, similar to step 3, only backwards).
If neither the departure point nor the destination exists in the system and if the delivery is a preliminary leg shipment or subsequent leg shipment, it is assigned to all legs. All other shipments with no departure point or destination in the system are only assigned to main legs. If this does not work either (because the leg indicator is not maintained, for instance), the deliveries are assigned to all legs that were created manually.
Now the system assigns the deliveries to border crossing points and load transfer points. The system then also checks which legs start or end at border point G, for example. All deliveries that are found in these legs are assigned to this border crossing point, since all deliveries that are shipped to this border crossing point must most likely go through customs.
Only deliveries that are to be loaded or unloaded at this point or those whose shipping type or service agent changes (meaning that they must be transferred) are assigned to a load transfer point.
If there are no legs that begin or end at this point, the system assigns all deliveries to this point.
regards,
Siddharth.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.