on 03-13-2008 12:41 PM
hi
my business process study reveels the following scenario
i need to do goods receipt inspection with inspection points
means the finish product say rice
i given paddy to the miller as a subcontarcting
iam getting rice as out put
i need to record inspction results on inprocess as well as at finish product
ie while processing from paddy to rice i will made timely inspection points and want to capture the result
and for final rice also i need to do inspection
how to achive this
if i chhose inspection type 04 and freeinspection points
system not accepting
plz suggest
sasikanth
sasi
is it solved ?
please come back
Regards
S.Anbalagan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
iam not getting error
while doing result recording i need to get as below
for inspection points
say MIC1,MIC 2 need to be recorded
for goods receipt
say MIC3,MIC4 NEED to be recorded
where as iam getting
for an inspection pont
all mc1,mc2,mc3,mc4
because i dont have routing iam having only inspection plan
in plan i gave inspection points.
and selected inspection type01
hope u got my problem
finally
i need to do resultrecording for inspection point without inspection lot
and in the same way i need to do gr inspection with inspection lot
plz suggest
regards
sasikanth
In operation 10 of your inspection plan, enter character MIC1 and MIC2.
Create operation 20 in your inspection plan, (I'd call the text something like "Final Inspection") and add charac MIC3 and MIC4 to this operation.
Use free inspection points.
You can make as many or as few inspections as you want on either operation. typically you'd have mulitple inspections on operation 10 and one inspection on operation 20.
Craig
hi
nice i dea
i tried as u said
settings made:-
inspection type 03 and 01
mic1and mic2 kept in 0010 opn
mic3 and mic4 kept in 0020 opn
in plan qp01 header inspection points were given (free inspection points)
result:-
inspection lot was created
in result recrding inspection points were not appear
need clarifaction on:-
1.how to trigger inspection points for a particular operation?
2.in result recording i need inspecton point for oeration 0010?
here inspection lot not nesaasry
3.for open 0020 inspection lot to be genearted where i can do result recording?
plz suggest
regards
sasikanth
For my proposal you use 04 inspection lot with early creation of the inspection lot.
Create an inspection plan with the proper usage for inspection type 04.
Select free inspection points in the header of the inspection plan.
Assign your characteristics. Release the plan.
Create and release your order. You should find an 04 inspection lot for it.
Select the lot, most work list will give a pop-up showing the two operations. Double click on the first one. Then you should get a pop-up asking for the inspection point identification. Enter in what ever you've set it up to require.
Record the results. Repeat previous step as often as you need to.
Craig
HI
with you r suggestion ican able to create gr with inspection points
here my requirement is for operation 0010 only i need inspection
points not forr the operaation 0020
in result recording screen i need to record the data which is for 0010 opn only inspection point
not for 0020 opn
how to assign inpsection point for a single ,specific operation
plz suggest
sasikanth
Hi,
Activate both inspection type 03 & 04.
And assign required inspection points in the header data screen of routings.
Thanks
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi sasi kanth
Do not mix with inspection with inspection points & final inspection.
As other memebr pointedout PL. activate inspection type 03 for inspection points & inspection type 04 for final inspection.
Regards
YMREDDY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
i need to do goods receipt inspection when i received
from a sub contracting
ie agianest purchase order.
the fert final operation was given to sub-contracting
in subcontracting plant iam taking hourly inspection while processing.(inspection points)
here i need to do result recording only
after compleetion of production i need to check certain parameters before the gr
means the finish product need to be go to quality stock
***then i need to do result recording and ud for the lot***
for the above scenario i can create a inspection plan
not routing
my problem is which inspection type i need to select
i thing its not 03
how to do inspection points result recording while making goods receipt
plz suggest
regards
sasikanth
vst-IT
Hi Sasi kanth
Inspection points inspection will be caried out for inspection type 03 ( in case of discrete mfg ) & 13 for ( incase of REM).
For GR inspection after production is completed , it should be 04 only.
This is the SAP Std Process.
I am not clear about your scenarion.
Pl. explain the scenarion still in detail.
Regards
YMREDDY
hi
i need to do goods receipt inspection using inspection points
which i nspection type i need to select
or how to configure an inspection type (new one) which contains attributes of inspection type 03 and 04
ie
how/what logic makes the system to understand when selecting 03 inspection type - is an on line inspection
plz suggest
regards
ssaikanth
vst
Hi Srinivas,
You have select inspection type 03 for inprocess inspection and 04 for inspection from Goods receipt from Production.
Inspection type 03, you can define free inspection points and you may inspect either at fixed time intervals or copletion of each operation etc.
Thanks and regards
Murugesan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.