Former Member
0 Kudos

hi

my business process study reveels the following scenario

i need to do goods receipt insection with inspection points

means the finish product say rice

i given paddy to the miller as a subcontarcting

iam getting rice as out put

i need to record inspction results on inprocess as well as at finish produt

ie while processing from paddy to rice i will made timely inspection points and want to capture the result

and for final rice also i need to do inspection

how to achive this

if i chhose inspection type 04 and freeinspection points

system not accepting

plz suggest

sasikanth

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

ok

Former Member
0 Kudos

Hi,

Activate both inspection type 03 & 04 . For inspection type 03 create a routing in routing header data assigned desired inspection point.

Regards

Amol

former_member42744
Active Contributor
0 Kudos

You define the use of the inspection points in the inspection plan. You must use "inspection with plan" in the material master set up and use an appropriate plan. Then you should get inpsection points with 04 inspection.

Craig