on 03-13-2008 12:39 PM
hi
my business process study reveels the following scenario
i need to do goods receipt insection with inspection points
means the finish product say rice
i given paddy to the miller as a subcontarcting
iam getting rice as out put
i need to record inspction results on inprocess as well as at finish produt
ie while processing from paddy to rice i will made timely inspection points and want to capture the result
and for final rice also i need to do inspection
how to achive this
if i chhose inspection type 04 and freeinspection points
system not accepting
plz suggest
sasikanth
ok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Activate both inspection type 03 & 04 . For inspection type 03 create a routing in routing header data assigned desired inspection point.
Regards
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You define the use of the inspection points in the inspection plan. You must use "inspection with plan" in the material master set up and use an appropriate plan. Then you should get inpsection points with 04 inspection.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.