cancel
Showing results for 
Search instead for 
Did you mean: 

Replacing from BC to XI

Former Member
0 Kudos

Hi...Experts,

we are upgrading from sap 4.7 to ECC 6.0, in that we want to replace from BC to XI..

how can i proceed for this.... pls send me any documents for this query..

what type of adapters are prefarable for this type.

its very urgent

Thanks & Regards,

Pasi.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check this Disscussion

Regards

Seshagiri

Answers (2)

Answers (2)

Former Member
0 Kudos

hi pasi,

we worked on this scenario in this u need to frame all the BC scenarios and need to design these scenarios in XI too.

there is no one to one replacement in this case.

it comes in a different project life cycle as a whole.

i think u r using SAP as source system for BC

no need to use any IDOC adapter in XI but i dont know what is ur reciever landscape in BC.

so now u need to focus on the adapters that u need to use depending on the type of recievers like JDBC for database and so on.

no need to use any adpters as source side as source is SAP and the data flow is IDOC.

if the data flow is through RFC then u need to use RFC adapter.

Thanks & Regards,

Rama Krishna

prateek
Active Contributor
0 Kudos

Start from here

https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/a8424011-0d01-0010-e19d-e5bd8ca5...

The adapters used would be based on the systems that are currently communicating through BC.

Regards,

Prateek