on 02-28-2008 10:21 AM
Hallo,
I have implement the first Steps for Business Process Monitoring. I have create the IDocs in the Satellite System an i want to select the Interface in the Solution Manager. I open the Business Process Monitoring from my Solution and open the Process. In the Process is the Step Interface Monitoring. I will choose my Interface but I have no chance to selection. Have anybody a Answer on this Problem?
Thanks
Hello Roland,
Martin's tip should be sufficient to select the interface. Anyway you should perhaps have a look under https://service.sap.com/bpm --> Media Library --> Technical Information --> Setup Guide - Interface Monitoring.
Best Regards
Volker
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Roland,
had the same problem. The trick is that you have to create two follownig business steps with different logical components (= different systems). On the graphic tab the two systems will appear. On the graphic draw an arrow (right-click) between these two steps / systems. Then the interface should appear for selection on the BPM setup.
Good luck,
Martin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.