on 02-26-2008 5:50 PM
Hello,
Can anyone confirm if the following is possible:
Link SRM 3.0 to ECC 6.0
Link SRM 5.0 to R/3 4.6C
Thanks,
AR
Hi,
Link SRM 3.0 to ECC 6.0
-> This integration would have serious RFC compatibility issues. Most search helps and backend validation would prove to be a real big head ache.
Link SRM 5.0 to R/3 4.6C
-> We have not heard/faced major issues with this combination. This should be fine to proceed.
More info in OSS Note: 1070623 - SRM and ERP Compatibility matrix
Regards
Kathirvel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Link SRM 3.0 to ECC 6.0
See the foll note:
Note 931020 - SRM connection to an ERP 2005 (ECC 600) back end
Related Notes
885690 - SRM 3.0 connection to ERP 2005
874589 - SRM 4.0 connection to an ERP 2005 system
815849 - FAQ: Account assignment system response
813733 - SRM connection to an ERP 2004 (ERP 1.0) back end
Link SRM 5.0 to R/3 4.6C
Pls refer the Master Guide for SRM 5.0.Under the S/w component matrix,you can see the details:
SAP® R/3 OLTP as of 3.1i up to SAP® R/3 Enterprise 4.70, ERP 1.0, ERP 2.0
(SAP R/3 4.6C or higher recommended)
So SRM 5.0 with R/3 4.6C is possible.
BR,
Disha.
Do reward points for useful answers.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.