cancel
Showing results for 
Search instead for 
Did you mean: 

BPM

Former Member
0 Kudos

Hi,

I have a scenario like, Idoc should be split into multiple destinations. Is it possible without bpm.

If so... could you please help me out.

-S

Accepted Solutions (0)

Answers (7)

Answers (7)

rodrigoalejandro_pertierr
Active Contributor
0 Kudos

as you can see all of us agree to add many receiver to one Receiver Determination. lets do this and let us know.

if you fix the problem, assings points and mark it as anwered please

Thanks

Rodrigo

Former Member
0 Kudos

Hi,

I think you could split IDOC to multiple destinations without BPM.

If in case the IDOC is on receiver side then you might have to go for BPM, but the receviers relied on AE can be split without BPM.

Refer below link for step by step process

Without BPM

multimapping without BPM

/people/jin.shin/blog/2006/02/07/multi-mapping-without-bpm--yes-it146s-possible

With BPM

Illustration of Multi-Mapping and Message Split using BPM in SAP Exchange Infrastructure

/people/sudharshan.aravamudan/blog/2005/12/01/illustration-of-multi-mapping-and-message-split-using-bpm-in-sap-exchange-infrastructure

IDOC BPM

/people/pooja.pandey/blog/2005/07/27/idocs-multiple-types-collection-in-bpm

Thanks

Swarup

Former Member
0 Kudos

What you are doing with BPM, that can be possible without BPM, but it is some difficult.

You take multiple business systems/business servicess.

In ID goto Receiver determination and add each receiver BS.

Former Member
0 Kudos

Hi,

Assigning several services in the Receiver Determination only copies the same message to several receivers.

If you need to split a large message into several smaller messages, you need split multi-mapping and also

don't need BPM, only an enhanced Interface Determination and a multi-mapping.

Refer to this blog for details:

/people/jin.shin/blog/2006/02/07/multi-mapping-without-bpm--yes-it146s-possible

Also in SAP Help:

http://help.sap.com/saphelp_nw2004s/helpdata/en/42/f3b31d48fb1bc8e10000000a11466f/content.htm

Message split using BPM:

/people/sudharshan.aravamudan/blog/2005/12/01/illustration-of-multi-mapping-and-message-split-using-bpm-in-sap-exchange-infrastructure

/people/narendra.jain/blog/2005/12/30/various-multi-mappings-and-optimizing-their-implementation-in-integration-processes-bpm-in-xi

Regards,

Gökhan

rodrigoalejandro_pertierr
Active Contributor
0 Kudos

hi,

yes is posibble and performance is better too,

go to ID--> Receiver determination and add each receiver BS, if nedded a condision too.

so, you will have 1 receiver determination and many Interface determination (many as receiver you define)

Thanks

Rodrigo

Former Member
0 Kudos

Hi !

Did you try with multiple receivers in Receiver Determination object. Each receiver should be a different business system.

Regards,

Matias.

Former Member
0 Kudos

Hi,

In one step it isn't possible without BPM. Only you can split it to one system because it's done after routing on IDOC adapter using feature called bundling.

Best regards,

Wojciech