Dear all,
I am using sample management. My inspection plan has characteristics with differnt partial numbers in different operations. Now the physical samples are created when the lot is created. Can anybody tell how to assign the physical samples to perticular operation? I mean how can I assign X samples to operation 10 and Y samples to operation 20.
Regards,
Manohar
Parital sample number is the link. Enter the partial sample number for each characteristic. The sample-drawing procedure then identifies the partial samples.
Craig