hi everyone

i need to do remote client copy from production system to development system(scc9). i noticed the difference in the patch levels which i will fix. so plz tell me about the other pre-requisites and and also tell me the settings i need to select while creating RFC connection?

thankyou

Accepted Solutions (1)

Accepted Solutions (1)

JPReyes
Active Contributor
0 Kudos

Hi Subhash,

Read,

http://www.sap-img.com/bc049.htm

Regards

Juan

Former Member
0 Kudos

i have gone through the link u have given but i need some guidance regarding remote client copy. and what backups do i need to take before performing remote client copy??

thanks

Former Member
0 Kudos

Hi Subash,

First make your patch level on both the systems same and then for the dev system just take the full online backup and also a redo log backup(transactional log) if you can just take a full offline backup by stopping your dev r/3 system.

Reward points if helpfull,

Vamshi.

Former Member
0 Kudos

HI VAMSI

should i perform full online backup once and redolog backup again or can i select full online back up+redolog back up ?