Where are we linking the Strategy group to the Material Type for Transfer of Requirements functionality to work?

Regards,

N

Nitesh Nagpal on Feb 21, 2008 3:21 PM

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

hi,

Strategy Group: The strategy group groups all the planning strategies that can be used for a

particular material. The planning strategy represents the procedure used for

planning a material and is (technically speaking) controlled by the MRP types. Standard values include (Make to Stock, Prod by Lot, Planning with Assembly, Planning w/o Assembly, Make to Order / no Assembly Order, Assembly/Service Order)

regards

sadhu kishore

Former Member
0 Kudos

Hi

There is no link between strategy group and material type as per my knowledge..

you may mistaken.. actually the TOR depends on Requirement Class... Requirement class is linked with requirement type..

Requirement type is determined on the following priority..

1. As per the strategy group assigned in the material master.

2. Item category/MRP type combination

3. Material type.

So the material type is linked with TOR via Req type -- Req class only

reward points if useful

Muthu

Edited by: Muthupandiyan on Feb 21, 2008 3:35 PM

Manoj_Mahajan78
Active Contributor
0 Kudos

Hi..

In material master go to MRP 3 view..

There one has to assign strategy grp.

Regds

MM

Former Member
0 Kudos

I am not talking about the material master MRP3 view, but i have read that it can be linked to your material type also!!

I was unable to find the settings, can anyone help me out?