cancel
Showing results for 
Search instead for 
Did you mean: 

Four systems transport landscape

Former Member
0 Kudos

Hi,

We have introduced pre-production environment.Now we need to configure 4 system transports.

How to configure 4 system transport landscape.

- Kristene

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member185954
Active Contributor
0 Kudos

Hello,

You need two do 2 things:

1. Include the system into your existing transport domain.

2. Re-configure the transport routes

To include the system into your existing transport domain check the following link:

http://help.sap.com/saphelp_47x200/helpdata/en/44/b4a0c17acc11d1899e0000e829fbbd/frameset.htm

To re-configure the transport routes:

You simply need to login into the 000 client of your domain controller and re-configure your transport routes.

as described in the link given below:

http://help.sap.com/saphelp_47x200/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/frameset.htm

Once you have re-configured the transport routes, do not forget to distribute the configuration.

Regards,

Siddhesh