cancel
Showing results for 
Search instead for 
Did you mean: 

what is product allocation in schedule line?

Former Member
0 Kudos

Hi Gurus,

Can you please tell me what is the purpose of product allocation?

Thanks,

Paul

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Product allocation field availble in sheduleline level. product allocation controlled in the requirement class.

Former Member
0 Kudos

hi,

pl check this :

Product allocation facilitates period-based distribution of products for certain customers or regions. As of Release 3.0F, you can carry out an availability check against product allocation. This ensures, for example, that when production is low, the first customer does not get the full amount, resulting in following sales orders not being confirmed or being confirmed far too late.

A precise planning and controlling mechanism is of the utmost importance for the execution of competitive order processing with guaranteed efficient and timely delivery to the customer of the required order quantity. Unforseen problems, such as production deficits or increased demand can have critical consequences for order processing and must be brought under control as soon as possible.

Product allocation is a function provided by the R/3 system for carrying out these control options intended to help your company to avoid critical requirement and procurement situations. This should enable you to keep production to a minimum at the same time as allowing you to react quickly to bottlenecks and changing market situations.

In the R/3 system, product allocations represent an ordered allocation of production for certain periods. Product allocations can be created according to various criteria (i.e., customer, regions).

Product allocations are created in the logistics controlling area in the planning hierarchy (Logistics ® Logist. controlling ® Flexible planning ® Planning create/change ® Planning type: COMMIT for SAP standard planning type). Product allocations are always divided right up to the lowest level in the hierarchy. The basis for the planning hierarchy is info structure "S140", which SAP issues as the standard info structure. It determines the criteria of the hierarchy. You can define your own info structures in Customizing for LIS (Logistics General ® Logistics Information System ® Reporting ® Standard Analyses ® Change settings).

Lakshmipathi
Active Contributor
0 Kudos

Dear John

The link will answer your question

[Product Allocation |http://help.sap.com/saphelp_46c/helpdata/en/93/744d12546011d1a7020000e829fd11/frameset.htm]

thanks

G. Lakshmipathi

Former Member
0 Kudos

HI John,

Product allocation field availble in sheduleline level. product allocation controlled in the requirement class.

Thanks & Regards

Sasikanth.Ch