on 02-14-2008 10:33 PM
Hi All,
Scenario: Where COGS material is calculated in PGI. Currently cost material in the sales order will be transfered to billing document. We could see the difference between cost in the sales order and COGS(PGI). I.e cost in the sales order $ 10.00 and COGS $12.5 as of now $10.00 is populated in billing document which is wrong. We need to populate $12.5 in the billing document?.
Requirement: I want copy COGS to my billing document in order to send COGS to CO-PA reports.
How can i acheive this?.
I assign double points if you provide me right answer..
Highly appreciate your help..
Regards,
Jagadeesan
HI Jagdeesan,
You will have to do a re-determination of pricing at billing level, for cost purposes only. You will have to do it in copy control at item level and will have to set the pricing type to N.(Redetermine the cost). This way your prices will remian fixed but your cost will be redeteremined.
Hope this helps.
Abhishek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abisheak,
Per your mail i have made configuration in VTFA. I did testing but It did not copy $12.50 to my billing document. It is still coming $10.00 in billing document.
Do you foresee anything else?.
Regards,
Jagadeesan
==========================================
Your mail
HI Jagdeesan,
You will have to do a re-determination of pricing at billing level, for cost purposes only. You will have to do it in copy control at item level and will have to set the pricing type to N.(Redetermine the cost). This way your prices will remian fixed but your cost will be redeteremined.
Hope this helps.
Abhishek
=============================================
Hi All,
Scenario: Currently cost material in the sales order will be transfered to billing document. We could see the difference between cost in the sales order and COGS(PGI). I.e cost in the sales order $ 10.00 and COGS $12.5 as of now $10.00 is populated in billing document which is wrong. We need to populate $12.5 in the billing document?.
Requirement: I want copy COGS to my billing document in order to send COGS to CO-PA reports.
How can i acheive this?.
I assign double points if you provide me right answer..
Highly appreciate your help..
Regards,
Jagadeesan
Hi,
In the delivery document to billing document copy control at item level set pricing type as B or C and set value as E in the price source field.
Hope this helps.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.