Dear gurus,

we want to activate INSPECTION TYPE 4 in our company, what will be the minimum requirement

pl suggest

vikas

Accepted Solutions (1)

Accepted Solutions (1)

eivind_kolderup
Participant
0 Kudos

Hi

my question is what do you want to achieve by using insp.type 04?

- Do you want to make a usage decision?

- Do you want to record test results?

- Do you want to handle physical samples?

...

Best regards

Eivind

Answers (3)

Answers (3)

Former Member
0 Kudos

problem solved

Former Member
0 Kudos

Hi Vikas,

first you tell me , what is your exactly requirement. why do you need to activate inspection type "04"

As i explained you it is used if material is inspected after the confirmation of production order or process order

ie material goes to QI stock if order confirmation is take place.

after that you have to make UD or Recording inspection result & UD Then only material will go to unrestricted stock.

if this is yuor requirement pl follow the following steps:

1. assign inspection type 04 & set indicator Active in the QM View in the material master

2.go to SPRO-- quality managementquality planning-inspection planning -general-assign task list type(Q) to material type (that one type you are going to inspect)

3. create inspection plan

usage 5 & status 4

4. if need to record inspection result ple assing MIC also

i think it will help you

best of luck

sadan

Former Member
0 Kudos

Hi gurus,

inQA32 I am doing RR , THE SYSTEM IS GIVING THE MESSAGE

No characteristics were found

Message no. QE214

Diagnosis

The system did not find any inspection characteristics for the inspection lot and operation you entered. This may be because:

You did not create inspection characteristics for the operation in the inspection plan.

You chose the wrong transaction.

No inspection characteristics fulfill the processing criteria you selected using the characteristic filter.

After activating the long-term inspection, only long-term characteristics are processed.

You wanted to display the individual result for the characteristic. The inspection lot is relevant for inspection points, but no inspection points have been created.

The inspection operation is created as a standard task with summarization in the routing.

Procedure

Check and, if necessary, change:

The characteristic filter

The characteristic filter determines which characteristics are processed.

The transaction with which you want to process the characteristics

If you have called up the transaction to process samples, but there are no sample results to record, choose the transaction 'Record results for an operation.'

WHERE IS THE PROBLEM

VIKAS

Former Member
0 Kudos

Hi

Please check whether any MICs attached to Inspection Plan?

Regards,

Krishna Mohan

Former Member
0 Kudos

NO MIC IN QP01, WHEN I TRIED THE SYSTEM IS ASKING FOR SAMPLING PROCEDUR E,

WHERE TO DEFINE SP

Former Member
0 Kudos

gurus problem solved

vikas

Former Member
0 Kudos

Hi,

Activate quality view in material master.

Create inspection setup, in this activate inspection type 04.

Activate quality pro active.

QM pro active key 07.

Create Quality plan by tcode QP01. It is just like routing.

Input your workcenter, control key and assign the inspection characteristics.

These are all sufficient to do 04 insp type.

Regards,

Dharma

Former Member
0 Kudos

Dear Dharma,

what is Activate quality pro active.

QM pro active key 07. & where we assign it

when we maintain qp01

i put usage- 5

status -4 , what else to be filled, system is giving the error

Task List Data

Contains Errors! at the time of saving

pl suggest

vikas

Former Member
0 Kudos

Hi,

QM Proc. Active field to be activated only for Raw material inspection.

04 inspection type is goods Receipt inspection from Production.

For this you have to maintain assign and activate 04 inspection type to any finished or semifinished product.

you have to maintain inspection plan for that material in QP01.

Specify material, plant ; in Header maintain Usage-5, status 4;check lot size range and UOM.

Then in Operation overview maintain operation and specify control key related to Quality inspection like QM01.

Selecting the operation, clik on Inspection characteristics and maintain them.

After maintaining this master data, whenever GR from Production happens, system creates one inspection lot and post the stock to quality stock.