cancel
Showing results for 
Search instead for 
Did you mean: 

MMBE Error

Former Member
0 Kudos

I am not able to do MMBE...

Can i do PGI without stock postings...

Edited by: John Smith on Feb 13, 2008 11:51 AM

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi John,

For posting stock use MB1C movement type as 561

For checking stock use MMBE

In VL01N if the item is there in stock then the system will allow you to do PGI otherwise it will give you error "storage location stock deficit" PGI means post goods issue that means you are issuing the material to the customer.

Hope this clarifies your doubt.

Reward points if solution helps.

Regards,

Allabaqsh G. Patil

Answers (4)

Answers (4)

ranjeetrajendra_jain
Active Contributor
0 Kudos

Johny

MMBE is to check stock, you got that all messed up.

Try MB1c after that, however before MB1c vluation assignments should be done to plant

TC

Lakshmipathi
Active Contributor
0 Kudos

Dear John

If you want to post stock for a particular material, use MB1C (not MMBE) and movement type 561.

thanks

G. Lakshmipathi

Former Member
0 Kudos

MMBE is only to check the Current Stock Position. Even if stock level is not checked & material is available Delivery & PGI is possible.

Regards,

Rajesh Banka

Reward points if helpful

Former Member
0 Kudos

hi john,

without stock u cant do pgi

reg,

raj..