Hi experts ,
Iam creating material reservations for a material in ECC side. I want to transfer them to APO. In the intergration model i enabled transfer of "Manual reservations". But out of the 5 or 6 material reservations only the first one is getting transferred . The rest are not getting transferred. I checked the queues on both ends for error . But there are no errors .Kindly help .
Edited by: Saradha Ramesh on Feb 11, 2008 4:14 AM
Check if the materials for which Reservations are not being sent to APO from R/3 are in active Integration Model (for Materials) or not. If not then add the materials in active integration model and retry.
Somnath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check if the materials for which Reservations are not being sent to APO from R/3 are in active Integration Model (for Materials) or not. If not then add the materials in active integration model and retry.
Somnath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Somnath,
Sorry i think i did not explain properly the first time. I have just one material for which material reservations exist. I have that material in an active integration model. But still out of the 5 to 6 reservations that exist for that material only the first reservation is getting transferred . Pls help