configuring Packaging in SD

former_member609634
Participant
0 Kudos

Hi !

Would it possible to let me know how do I configure PAckaging in SAP ECC 6.0 P.

Rgds,

Indrajit

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello Indrajit,

Below are the steps to configure Packaging,

Before creating the packaging material you have to go to:

IMG-Logistics Execution-Shipping -Packing.

1. Define packaging material types- it can be anything like boxes crates, etc. in this you have to maintain the output determination procedure, output type, plant determination, packaging material category, generate delivery items, number assignment. you can copy from standard also.

2. Then go to define material group for packaging materials - here you maintain the four digit code and the description. Actually, this group is nothing but similar products which require similar packing products. For Ex. Nokia Phones all types they are basically packed first into a polythene bag. So here nokia phones can become a material group for packaging materials and polythene bag can become the packaging material type which can include different sizes and types of polythene bags.

3. Define Allowed Packaging Materials - Here you assign the shipping group for packaging materials to the packaging material type. This is related to your mterial master data of the packaging material which you create.

4. Now go to MM01 to create a packaging material. use material type as Packaging material then inside the system will take the item category group as VERP. Then in the Basic Data1 screen you have the material group for packaging material (MGPM). Slect the proper one. Now in the Sales:General/ Plant screen you have to maintain data regarding the packaging. you select the MGPM same as the basic data 1 screen, then select the packaging material type, the allowed pkh weight, allowed pkg volume. This is important because if the weight of your finished item is 2 KG and in the allowed pkg weight you enter only 1.5 KG, then while you carry out the packing process in delivery, the system will give you error," packaging weight exceeded." The assignment in the IMG creen for Define allowed packaging materials should be same as u mention in the material master. Then save your material master for packaging material.

5. VA01 create the order, save it.

6. VL01N enter shipping point, go to edit - pack- you will face a screen with 2 parts. In the top part you select your packaging material in which you want to pack your finished item, enter the system will assign a number to that material. Now select the Material in the top part and the finished one in the lower part and click on the Icon Pack. Here one thing has to be taken care of. Suppose if you want to pack only one finished item in one packaging material, then in the lower part of the screen you have a field for partial quantity here you chnge it to 1. system will prompt quantity changed. now you select the material in the top part and the one in the lower part and click on the PER PART. QTY ICON. In this way the system will pack only one finished item in a single packaging material. Packing is done go back, select the picking and do the PGI. save the delivery and create the invoice.

Thanks

Murtuza

Former Member
0 Kudos

hello indrajit

I tried to create a packing material and followed all ur steps .I was able to complete everything except during the delivery after creating the edit ---> pack and selecting the items .. i was not able to see my packing material on the item lines in the delivery ..or even in the invoice.. ( i have not maintained any pricing for the packing material). how we can make the packing material visible on the item lines?

thankyou