on 10-12-2005 6:57 AM
My End to End monitoring doesn't work.
I changed parameters
Orientation value for the process
Number: 3000 per hour
Average duration: 10 Minute(s)
Maximum duration: 2 Hour(s)
I see error messages
ASSEMBLER Exception: The input data is invalid
ASSEMBLER AssemblerDurationTotal: Duration of the assembler run exceeds the threshold value specified
Diagnosis
Job 5D6B404384CAD06EE1000000AC110C70 | 14131001 | Term has terminated at least once.
<b>SM37</b>
The input data is invalid
Job cancelled after system exception ERROR_MESSAGE
<b>Exception in defaultTrace
</b>
Error sending PMI records to http://server:8000/sap/bc/spi_gate, HTTP response: 403Forbidden. Please check the HTTP destination "pmistore".
I changed a port in exchangeProfile
<b>com.sap.aii.rwb.server.centralmonitoring.httpport</b>
from 50000 to 8000
But it doesn't help
Could you help me? How to solve this problem?
Have you set up the pmistore destination like described in the installation guide? (Installation Guide SAP Exchange Infrastructure 3.0, chapter Creating HTTP Destination pmistore in the SAP J2EE Environment.)
Also on help: http://help.sap.com/saphelp_nw04/helpdata/en/06/5d1741b393f26fe10000000a1550b0/frameset.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes Admin set up pmistore. May be he configured incorrectly.
I don't know hot to check it.
Thaks for document. Could you explain how to check:
3. Ensure that the service user for the Runtime Workbench (XIRWBUSER) has been <b>defined in each component</b> that is to be included in end-to-end monitoring.
4. Ensure that enough batch processes are available on the central monitoring server.
He told me that he did't create XIRWBUSER manually. But this users exists.
Message was edited by: Denis Ivanov
User | Count |
---|---|
84 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.