on 02-02-2008 10:29 AM
Dear QM masters,
I have following scenario:
Material A has Material B as a component and Material B has Material C as component. Material A is batch managed. Material C has in-process inspection with partial lot using inspection point functionality. Last result recorded for this in-process inspection should be used for quality certificate of Material A.
Thanks a lot in advance for any help extended and will be rewarded with maximum points.
Thanks and regards,
Devang
Since you are in ECC 6.0 you can also use batch derivation to have the components values copied to the next material being made. In this way, batch values for Material C get copied to material B batch and material B batch values get copied to Material A batch.
Then on the cert, you only need to report the value from the material A batch. No need to set up the result from production chain in the COA profile.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you are in which SAPm version? 4.7 or lower?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.