on 10-12-2005 1:43 AM
Hi,
I have a BPM defined as an Integration Process in Designer. I transferred the Integration Process from Repository to the Builder.
Now I have updated my BPM Process in Designer/Repository but the "new" outbound and inbound interfaces do not seem to show up in the Builder.
If I create a new integration process and point it to the BPM process then it shows the new changes but how do I update the existing Integration Process in the Builder to show the "new" outbound and inbound interfaces?
Thanks
Ashish
Ashish,
In the integration directory, delete the Integration Process and recreate it with same name (case sensitive), then it brings up the current BPM config. This is a known problem but have not seen any other solution other than doing this.
regards
Shravan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ashish,
open the process in the Builder in edit mode and then
hit "Service" -> "Refresh interfaces". This fetches the
new interfaces from the Repository.
Regards,
Hermann
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We need to re-import the BPM in the ID when ever the process signature of the BPM changes happen in the IR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.