Hi.

We are about to set up the Pharmaceuticals Industry Solution, but we wish to do so on top of the latest Norwegian baseline package. Reading the IS Pharma quick guide, I get the impression that only US or German baseline is supported when you wish to add a IS Pharma on top. Is this correct?

We want to add Norwegian baseline layer 0, 1 and some layer 1 scenarios on top of the ECC 6.0 (ERP 2005) installation. Then the IS pharma package. Can this be done, and is it supported by SAP?

It would look something like this:

5. IS Pharma

4. Layer 1 Scenarios

3. Layer 1 Building Blocks

2. Layer 0 Building Blocks

1. ERP ECC 6.0

Should the sequence be different, i.e. IS Pharma before Norwegian baseline?

Regards,

Thomas

Accepted Solutions (0)

Answers (1)

Answers (1)

ThomasKjelsrud
Participant
0 Kudos

We did not include the IS Pharma solution, so the question is not valid for us anymore.