cancel
Showing results for 
Search instead for 
Did you mean: 

make-to-order

Former Member
0 Kudos

Hi gurus,

What is make-to-order and how to configuration.pls send me some material to my mail id.

Id: rao.bsap@gmail.com

Thanks&regards

rao.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Rao,

I have sent you a detailed presentation on make to order scenario please find the same in your e-mail..

Reward points if it helps

Regards

Atul Keshav

Lakshmipathi
Active Contributor
0 Kudos

Dear Atul

Had you shared the information in this forum instead of posting to personal mail id, it would have been wonderful, coz, you are guiding the members those who are interested to know the MTO scenario.

Henceforth, please share in this forum rather posting to personal mail id.

Thanks

G. Lakshmipathi

Former Member
0 Kudos

Dear Atul,

Pls share the details in the forum also as some more person will get help from it.

kindly post it again on the forum if you don't mind.

regards,

Thakur

Former Member
0 Kudos

This message was moderated.

Answers (4)

Answers (4)

Former Member
0 Kudos

herer i am getting a warningf , you cannot make an assignments to make to order stock. Please go throguh it and help me

.Also if somebody has config documents, please sharwe with me for MTO secenario

Lakshmipathi
Active Contributor
0 Kudos

Dear rao

Check the link and drill down on the left tab once you opened the link, for more information

[Make-To-Order Production |http://help.sap.com/saphelp_46c/helpdata/en/dd/5600b1545a11d1a7020000e829fd11/frameset.htm]

Thanks

G. Lakshmipathi

Former Member
0 Kudos

Hi Rao,

Make to order Scenario

1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.

2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.

3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.

(a) Make to order using sales order

(b) Make to order using project system (not relevant for SD application)

4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.

5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things

the strategy group (MRP 3) in MMR

the MRP group (MRP1) in MMR

the item category and MRP type (MRP 1)

6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.

MAKE TO ORDER PRODUCTION (PROCESS FLOW)

First Create a material with MM

Basic data1:

Give Material name : Cycle

Material group : 010

Division : MA

Net Weight : 10 Kg's

Gross Weight : 10Kgs.

Sales: Sales org.1 :

Base Unit of Measure : EA

Delivering Plant : RAMA

Output Tax : 1 ( Full tax)

Sales: General/Plant :

Availability Check : 01 ( Daily Requirements)

Trans.,group : 001

Loading Group : 0003

MRP 1:

MRP Group : 020 ( Make to Order Production)

MRP type : PD (MRP)

MRP controller : 000

Lot size : EX ( Lot-for-Lot order quantity)

MRP 2:

In-house Production : 1

Schedule Margin Key : 000

Forecasting:

Forecast Model : D (Constant Model)

Accounting 1:

Price control : V ( Variable Price)

Variable Price : 4000

Price Unit : 1

Then enter & Save.

Material 769 created.

Create a Sales order with VA;

Order type : OR

Sales Organization : RAMA

Distribution Channel : RA

Division : MA

Sales Office : RAMA

Sales Group : RAM, .............. Enter

Sold to Party: 6000000000

PO number : 55 , PO Date : 04.06.2007.

Item Overview Tab:

Material 769, Quantity : 100

Enter & Save the Document.

Sales Order 8212 Created

Create Production Order with CO:

Enter Sales order number: 8212, Item No. 10

Order type: PP, Enter

Click on FLAG,

Select Generate Operation and enter NO,

save the Document.

Production Order Created: 60002725

Confirm the Production Order with CO15.

Enter Production Order No. 600075 and save the Document.

Now the confirmation Order will be saved.

Create Goods Receipts with MB31.

Movement type: 101

Order: 6002725

Plant: RAMA

Storage Location: RAMA

Enter and Save, you will get Document Posted: 50000068931posted.

Check the Stock Position with MMBE

Material: 769

Plant: RAMA

Storage Location: RAMA

Execute (F8), here we can see the stock at Sales Order Stock.

Create Delivery with VL01N, Billing with VF01 and Post to Accounts.

Make-To-Stock Production:

Purpose

we describe the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material withdrawals and confirmation of the operations, you analyze the production variances. The sales order is delivered and settled.

Process Flow

1. Planning a Product

T.code: MD61

Planned Independent RequirementsDemand Management Production Planning  Production Logistics Create

2. Creating a Sales Order

T.code: VA01

Create Order  Sales  Sales and Distribution Logistics

3. Executing Multi-Level Requirements Planning

T.code: MD02

Single Item - Multi-LevelFrom the MRP node, choose Planning

4. Converting the Planned Order into a Production Order

Tcode: MD04

From the MRP node, choose

Stock/Reqmts listEvaluations

5. Withdrawing the Material for the Production Order

T.code: MB1A

Issue Goods Movement  Inventory Management Materials ManagementLogistics Goods

6. Confirming the Production Order

T.code: CO11N

For Operation Enter  Confirmation  Production Control Production Logistics Time Ticket

7. Creating a Delivery

T.code: VL01N

Shipping and Transportation Sales and Distribution Logistics Single Document Reference to Sales Order Create  Outbound Delivery With

8. Creating a Billing Document

T.code: VF01

Billing document Billing  Sales  Logistics Create

Reward points pls.

Regards,

Govind.

former_member204513
Active Contributor
0 Kudos

Hi Rao,

Go through this link you will get more info about Make-to-order.

http://help.sap.com/saphelp_47x200/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm

Thanks,

Murali.